Reform of the cabin of the Train Fleet 1400 and reform of the electrical cabinet of the train fleet 1600 of the CPTM.
Final client:
ALISON
Scope of Services:
Disassembly of the area next to the old cabin including seats, hand grips, wall cowlings and ceiling lining for installation of an electrical cabinet structure and a new closure with wider layout for the operator.